Cable tracing
Cable tracing and patch panel documentation
The cable schedule says where a cable goes. RoomScene 3D shows the whole path: device port, patch panel front, panel rear, trunk, the next panel, the switch, drawn through the racks.
Download the 30-day trial Ask for a quote
Ports and patch panels
Ports belong to devices, each with a connector type. Patch panels are created with front ports 1…N and rear ports R1…RN together, and each front port is paired with its rear port. That pairing is what lets a trace continue through the panel instead of stopping at it.
A trace, hop by hop
Press Trace on any port. The card lists every hop; click one to open that device. An example from the demo data:
ARC-SRV-01iDRAC, rack A07 U21- Cable
NW-0001, Cat6A, 2 m PP-A07-1port 5 → through the panel → R5, rack A07 U40- Trunk
TR-A07-A01-05, Cat6A, 18.5 m PP-A01-1R12 → through the panel → port 12, rack A01 U20- Cable
NW-0002, Cat6A, 3 m NET-A02Gi1/0/12, rack A02 U41
Totals above the list: 3 cables, 23.5 m, 2 patch panels. In the scene the route leaves A07 at the front, enters the panel, exits at the rear, runs along the overhead tray to A01 and A02, and the racks off the path fade.
Cable list in Excel
Most facilities have a cable schedule already. Import it as it is:
| Column | Example |
|---|---|
| Cable label | NW-0001 |
| A device | ARC-SRV-01 |
| A port | iDRAC |
| B device | PP-A07-1 |
| B port | 5 |
| Cable type | Cat6A |
| Length | 2 m |
- Ports that do not exist yet are created.
- On patch panels, “R12”, “Rear 12” and similar are read as rear port 12 and paired with front port 12.
- A label that already exists with different ends is moved to the new ends, not duplicated.
- Conflicts are shown in the preview before anything is written, for example a port that already has another cable.
- Export gives you the same columns back, for the whole site or one room.
Live records with a history
Cables are not part of a layout draft; they describe what is plugged in now. Every change is written to the change log with who and when. The device card has a Connections tab with its ports, what each one is patched to, and a Trace button.
Questions
Does it discover cables automatically?
No. Cables come from your cable list or are entered on the device card. There is no LLDP or CDP discovery in this release.
Is it only for copper?
No. Ports and cables have a type, so fibre, coax/SDI and trunks are documented the same way.
Try it on your own rooms
Install the trial on a test server, import one room from Excel and connect monitoring. Questions, quotes and licence requests: contact@roomscene3d.com.