RoomScene 3D
Download

Rack elevations

Rack elevation software for broadcast equipment rooms

A rack elevation drawn in Visio is correct on the day it is drawn. In RoomScene 3D the elevation is a view of the inventory, so it changes when the inventory does.

Download the 30-day trial Ask for a quote

Rack card beside the 3D view: occupancy, power, weight, temperature and devices by U
Fig. 1 Rack A05 and its card: U occupancy, measured and nameplate power against the budget, weight, inlet temperature and the device list by U.

Why elevations go stale

In a broadcast facility racks change every week. A playout server arrives for a channel launch, a frame card is swapped, a KVM is retired. The engineer doing the move rarely updates the drawing. Six months later the drawing says U21 is free, and the person carrying the new 2U server finds a router frame there.

The fix is not more discipline with Visio. It is having one record per device and drawing the elevation from it.

Elevations from the inventory

RoomScene 3D keeps one record per device: room, rack, U position, height, model, serial, management IP, owner. The front view of a rack is drawn from those records. Move a device in design mode and the record moves with it. There is no second document to keep in step.

  • Each device at its real U range, its front panel drawn from type, height and colour
  • Front view for the elevation, 3D for the room, top view for the floor plan
  • Free U and the largest free block per rack
  • Nameplate power against the rack's budget, weight against its load limit
  • Floor equipment in the same room: CRAC units, distribution boards, fire suppression, desks
  • Live status on every device from Zabbix or the built-in ping/TCP check

Getting the data in

If the elevations live in Excel today, import that. The template has columns for room, rack, U and height next to model and serial. The import shows every row in a preview and tells you which ones it cannot place, and why.

Where nobody trusts the documentation, our modelling service builds the racks from a photo of each rack front, at $40 per rack.

Drawing versus model

Drawing (Visio, CAD, spreadsheet)RoomScene 3D
Source of truthThe drawing itselfThe inventory; the elevation is a view of it
After a moveSomeone has to redraw itChanges when the device record changes
StatusNoneZabbix or ping status on every device
Power and weightA separate spreadsheetPer rack, against budget and load limit
CablesA separate cable schedulePorts, patch panels and traced paths on the same devices
Change controlFile versionsDraft, approval, work order

Planning a change

Open a draft for the room, drag the server to the free 2U at U21 of the next rack, and the capacity figures update as you go. Send the draft for approval; the work order lists each move with old and new position. Until the last step is ticked, the live elevation shows what is really in the rack.

Questions

Do we have to model every rack at once?

No. Start with one room. Racks you have not modelled are not counted against the licence.

Can devices that are not in Zabbix go into a rack?

Yes. Anything can be in the inventory: patch panels, frames, KVMs, passive gear. Mark equipment that cannot be monitored as “not monitorable” so it does not show as missing.

Try it on your own rooms

Install the trial on a test server, import one room from Excel and connect monitoring. Questions, quotes and licence requests: contact@roomscene3d.com.

Download the 30-day trial Ask for a quote

contact@roomscene3d.com · tahirfeyzioglu@gmail.com