Zabbix in 3D
3D visualization of your equipment rooms for Zabbix
Zabbix knows that a power supply failed. It does not know that the server sits in rack B07 at U16, behind the CRAC unit. RoomScene 3D puts the Zabbix problem where the hardware is.
Download the 30-day trial Ask for a quote
What Zabbix maps leave out
Zabbix network maps are good at topology: which switch feeds which host. They are drawn by hand, in 2D, and have no idea of a room, a rack or a U position. When a trigger fires at night, the on-call engineer still has to find the box.
How RoomScene 3D reads Zabbix
- One connection, a read-only API token. Nothing is written to Zabbix.
- Each inventory device is linked to a Zabbix host. When you start, hosts with matching names are linked automatically; the rest wait in an unplaced list filtered by host group.
- Open problems are drawn on the device in Zabbix severity colours. The rack takes the worst colour of its devices and glows; the room list shows a count.
- Severity counters in the toolbar filter the scene: show only Disaster and High, for example.
- Problems of disabled hosts and triggers are left out.
- The device card links to the host in Zabbix for graphs and history. RoomScene 3D does not copy history.
Where each Zabbix value appears
| From Zabbix | In RoomScene 3D |
|---|---|
| Open problems and trigger severity | Device colour, rack glow, room counter, device card |
| Host groups | Inventory filter, unplaced list, device type guess |
| PDU power items (W, kW), total or per phase | Measured rack power, power heat map, A/B feed load |
| Inlet and ambient temperature (°C) | Temperature heat map, rack card |
| Hosts without an inventory record | Reconciliation list |
Power and temperature items are read every two minutes. For PDUs the total item is used, or the sum of the phases if there is no total; outlet, rated and peak items are ignored. For temperature only inlet and ambient sensors count. A rack without a PDU takes the sum of its devices' own power readings.
Equipment rooms, not only data halls
RoomScene 3D was built in a broadcast facility. Besides rack rooms it models studios, galleries and control rooms with cameras, monitor walls, LED walls and lighting. A camera CCU or an LED processor monitored in Zabbix shows its problem on the camera or the wall in the studio, not just in a list.
Rooms or devices without Zabbix
Not everything is in Zabbix. Switch on the built-in check and devices with a management IP are pinged or checked on a TCP port. Three missed rounds open a High problem in RoomScene 3D; it clears when the device answers. Devices linked to Zabbix are left to Zabbix.
Questions
Does it need Zabbix maps or a special template?
No. It uses hosts, problems and items you already have. For power and temperature, standard PDU and sensor items are recognised by their units and key patterns.
What if Zabbix is down?
The rooms and the inventory stay available. Status shows when the last successful read happened, so nobody mistakes stale data for healthy.
Try it on your own rooms
Install the trial on a test server, import one room from Excel and connect monitoring. Questions, quotes and licence requests: contact@roomscene3d.com.