Tally
TSL tally on a 3D model of the studio
Tally lights tell the camera operator and the presenter. RoomScene 3D tells everyone else: the engineer in MCR, the facility manager, anyone with the page open.
Download the 30-day trial Ask for a quote
What you see
- The camera on program: a red lamp on top and a red ring on the studio floor.
- The camera in preview: a green lamp.
- Changes as the director cuts. The scene is updated live in every open browser.
- The same camera still shows its monitoring status from Zabbix or the built-in check.
Protocol support
| TSL UMD 3.1 | TSL UMD 5.0 | |
|---|---|---|
| Transport | UDP or TCP, same port | UDP or TCP, same port; DLE/STX framing on TCP |
| Program | Tally 1 | Red or amber |
| Preview | Tally 2 | Green |
| Version | Detected from the packet | Detected from the packet |
| Default port | 8900 | 8900 |
Setting it up
- In Settings › Tally, switch the listener on and check the port.
- Add the RoomScene 3D server as a TSL destination on the vision mixer or tally router: its IP address and port.
- Sources appear in the list as packets arrive, with address and label. Map each one to a camera.
- Or set the tally address on the camera's card, under Network.
- If the mixer is on another VLAN, open the port for UDP and TCP on the firewall in between.
What it does not do
It does not send tally anywhere and does not replace your tally system. It reads what the mixer or tally router already sends to multiviewers and UMDs. ATEM, vMix, OBS and GPI sources are not supported in this release; TSL UMD is what most broadcast mixers and tally controllers can output.
Why put tally in a 3D model
A tally light is only visible in the studio. On a shared facility the people who need to know what is live are elsewhere: the engineer about to reboot a CCU, the lighting crew, the person on call checking a fault. A 3D view of the studio with the live camera marked answers “can I touch this now?” without a phone call to the gallery.
Questions
Do we need a separate tally licence?
No. Tally is part of every tier. Cameras sit in studios, and studios are not counted.
Can several mixers send to it?
Yes. All sources arrive on the same port and are listed with their addresses; map each to its camera.
Try it on your own rooms
Install the trial on a test server, import one room from Excel and connect monitoring. Questions, quotes and licence requests: contact@roomscene3d.com.