RoomScene 3D
Download

Download

Download RoomScene 3D

One installer for Windows. The trial runs 30 days with every feature on. No form, no credit card.

Download the installer

RoomScene3D-Setup.exe · Windows installer, 64-bit

System requirements

Requirement
ServerWindows Server 2019 or later, or Windows 10 / 11, 64-bit
Memory4 GB RAM
DatabasePostgreSQL, bundled and set up by the installer
Client PCsA current Chrome, Edge or Firefox with WebGL. Nothing to install.
Monitoring (optional)Zabbix with a read-only API token, or the built-in ping/TCP check
Tally (optional)A TSL UMD 3.1 or 5.0 source: vision mixer or tally router
Sign-in (optional)Active Directory over LDAPS or StartTLS

Installation

  1. Run the installer on the server as an administrator.
  2. It installs RoomScene 3D and PostgreSQL as Windows services and opens the setup wizard in the browser.
  3. In the wizard, connect Zabbix if you have it: paste the URL and a read-only API token. The wizard tests it before saving.
  4. Create the first admin account. Then import your inventory from Excel, or start with an empty room.
  5. Open the web port on the server's firewall for client PCs, and the tally port (8900, UDP and TCP) if you use tally.

After the trial

Buy a licence by email (contact@roomscene3d.com). Then, in Settings › License, enter the licence code to activate online, or load a .lic file if the server has no internet access. The machine ID on that page is what we need for the .lic file.

When the trial ends without a licence, monitoring and alarms keep working. Editing, design and import lock until a licence is loaded. Nothing is deleted.

Yearly licence, prices in US dollars
StandardProfessionalEnterprise
RacksUp to 50Up to 200Unlimited
Price per year$999$1,990$7,500
Studios, galleries, control roomsNot countedNot countedNot counted
FeaturesAllAllAll
InstallationOne serverOne serverOne server

contact@roomscene3d.com · tahirfeyzioglu@gmail.com